2.4.8 All units attached to the fixture must be designed and built to be located with two dowels. 2.4.9 Elevated or secondary bases with multiple details must implement machined corners on the sub-base when units are doweled at assembly. Sub-base corners shall be labeled / stamped with the appropriate coordinates back to tooling bushings. implement machined corners.