After the data of all operation centers are summarized, it is necessary to allocate the resource cost to the corresponding operations according to a certain proportion, and the basis of allocation needs to be determined according to the cost driver of the operation, and the corresponding cost of the operation is finally determined by the ratio determined by the cost driver of the operation project.
正在翻译中..