1.3.3System 3, Automatic Assembly 3(AM3)1.3.3.1Conveyors and equipment for transportation of components to AM3Handling of half plastic pallets with collar from the vertical pos. 1.37 One two-floor conveyor pos. 2.12 for transportation of half plastic pallets of RS to assembly machine which will be equipped at end with a chain conveyor to unload this end position to pos. 2.25 for empty pallet with collar and to position 2.26 for pallet with inserts for half pallet. The lowest level of this conveyor is for transportation of empty pallets or return of rollers to vertical 1.37 back to basementOne conveyor for transportation of CP & RG with a V-blocker at the end of conveyorTwo lift tables equipped with driven rollers and chain conveyors for unloading the empty pallets with collar pos. 2.25 to the below conveyor and the pallet with blisters to pos. 2.26A culvert on floor for intake of inserts from roller boxes pos. 1.39 for transportation to a belt conveyor in basement (SKF prepare sawing the floor)One portal/stative for vision camera for scanning rollers pos. 3.6(Option)One scale for weighting of pallet with rollers in order to be able to calculate the right number of rollers with return (where?)The PLC of Automatic Assembly will control conveyors in pos. 2.21, 2.12, 2.25, 2.26, 3.6, 2.22 and 2.24 and communicate with robot cells and ask for current components PLC和控制由谁执行?Mechanical installation of all equipmentElectrical cabinet, electrical installation, cabling, canalization and CE-marking of these equipment will be done by the supplier of system 3.
1.3.3System 3, Automatic Assembly 3(AM3)<br>1.3.3.1Conveyors and equipment for transportation of components to AM3<br>Handling of half plastic pallets with collar from the vertical pos. 1.37 <br>One two-floor conveyor pos. 2.12 for transportation of half plastic pallets of RS to assembly machine which will be equipped at end with a chain conveyor to unload this end position to pos. 2.25 for empty pallet with collar and to position 2.26 for pallet with inserts for half pallet. The lowest level of this conveyor is for transportation of empty pallets or return of rollers to vertical 1.37 back to basement<br>One conveyor for transportation of CP & RG with a V-blocker at the end of conveyor<br>Two lift tables equipped with driven rollers and chain conveyors for unloading the empty pallets with collar pos. 2.25 to the below conveyor and the pallet with blisters to pos. 2.26<br>A culvert on floor for intake of inserts from roller boxes pos. 1.39 for transportation to a belt conveyor in basement (SKF prepare sawing the floor)<br>One portal/stative for vision camera for scanning rollers pos. 3.6(Option)<br>One scale for weighting of pallet with rollers in order to be able to calculate the right number of rollers with return (where?)<br>The PLC of Automatic Assembly will control conveyors in pos. 2.21, 2.12, 2.25, 2.26, 3.6, 2.22 and 2.24 and communicate with robot cells and ask for current components PLC和控制由谁执行?<br>Mechanical installation of all equipment<br>Electrical cabinet, electrical installation, cabling, canalization and CE-marking of these equipment will be done by the supplier of system 3.
正在翻译中..