Delivery time is limited by the mold, each mold can only make a product every day, I think to do more than 3 molds, a total of 4 molds, 25 working days can do 100 tubes, plus assembly 5 days, manufacturing mold a week, a total of 7 weeks can be delivered.<br>Mold cost last one is $176.47, now do more than 3 is a preferential price of $160.00 / branch, a total of $480.00.
正在翻译中..