1, open the folding bucket, inject the media for 5-100 degrees C of clean water, and then turn on the power standby.<br>2, the inlet water pipe self-locking connector connected to the test pressure pump into the water base, the return pipe plug in the regulator valve out of the water outlet, and the inlet and back pipe into the barrel.<br>3, press the "start" switch, wait ingest the outlet has normal water flow out of the stop, tighten the pressure gauge under the copper discharge knob, and connect the water high-pressure pipe.<br>4, after the start to the pipe under test pressure, the pressure control valve on the red knob slowly screwed down, the pressure value of the table to reach the required pressure of the pipe (0-1.2MPA), lock hold pressure lock plate, stop the pressure.<br>5, after the shutdown of the pressure, observe whether the pressure value has decreased, such as the pressure value is lower than the required test value can be then start-up replenishment, after the replenishment, if there is still a pressure drop, to check the connections and the pipeline under test whether there is a leak.<br>6, after the test is completed, disconnect the power supply, open the discharge valve switch drain discharge pressure, and loosen the pressure control knob reset.<br>7, please use the control knob correctly, do not first turn the pressure knob to the end, otherwise high pressure will cause high-pressure loss of the meter phenomenon.<br>8, this product is suitable for all types of pressure vessels, heating pipes, home pipes and fire pipes and fire-fighting self-injection system detection and maintenance.
正在翻译中..