桩位放样⑴根据设计要求计算出布设的排数和列数,画出布桩图,标明排列的编号。⑵根据布桩图在铺设好的第一层砂垫层上放出具体的桩位,做出鲜明的标志。放桩位时一般一次不宜过多。施工中应注意检查和保护,丢失的及时补上。⑶布桩图同时要交由现场施工人员,每施打一根在图上相应位置标出,以免超布或遗漏。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Stake stake out <br>⑴ Calculate the number of rows and columns to be laid out according to the design requirements, draw the layout of the pile, and indicate the number of the arrangement. <br><br>⑵According to the layout of the pile, the concrete piles will be placed on the first layer of sand cushion, and a clear mark will be made. It is generally not appropriate to place too many piles at a time. Attention should be paid to inspection and protection during construction, and make up for lost in time. <br><br>(3) At the same time, the layout of the piles must be handed over to the on-site construction personnel, and each one will be marked at the corresponding position on the map to avoid over-laying or omission.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Pile loft<br>(1) According to the design requirements to calculate the number of rows and columns laid out, draw a pile map, indicating the number of the arrangement.<br><br>(2) According to the pile map in the laid the first layer of sand mat to release the specific pile, make a distinctive sign. It is generally not appropriate to place too much at a time when placing piles. Construction should pay attention to inspection and protection, lost timely replacement.<br><br>(3) The pile map should also be handed over to the site construction personnel, each cast a stick in the map on the corresponding position marked, so as not to over-cloth or miss. ...
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Pile position lofting<br>(1) calculate the number of rows and columns to be arranged according to the design requirements, draw the pile layout drawing, and indicate the arrangement number.<br>(2) according to the pile layout, the specific pile position shall be set out on the first layer of sand cushion, and clear marks shall be made. In general, it should not be too much at one time. During the construction, attention shall be paid to inspection and protection, and the lost ones shall be supplemented in time.<br>(3) the pile layout drawing shall be submitted to the site construction personnel at the same time, and each pile shall be marked at the corresponding position on the drawing to avoid over distribution or omission.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: