1, GTL models waterproof membrane R & D to make changes, is expected to November 30 Kusakabe change orders <br>2, temporarily: 1, enhance staff self-inspection, mutual inspection, 2, requires the driver to issue a self-test offline
1, GTL model's waterproof film R.D. changes, is expected to be issued on November 30, change order<br>2, temporary: 1, strengthen the staff self-inspection, mutual inspection, 2, require offline drivers to carry out self-inspection
1. The waterproof membrane R & D of GTL model is changed, and the change order is expected to be issued on November 30<br>2. Temporary: 1. Strengthen self inspection and mutual inspection of employees; 2. Require offline drivers to conduct self inspection on Problems<br>