4) removal of the support structure should observe whether there is an obstacle near power lines, power lines is prohibited near the collision, to prevent electric shock accidents. <br>5) material delivered to the designated location with the ground should be removed with the operation, classification piled up, the day of demolition material in clear day, for safekeeping.
正在翻译中..