After the equipment is assembled, the equipment is first commissioned to ensure that the load can operate normally and there is no failure.<br>First, plug in the power outlet to power on. <br>Second, the manual/automatic switch selected to the manual stop<br>Separately start the lifter, stir the dragon, dial grain wheel and fan, observe whether there are anomalies, confirm that no abnormality will be manual / automatic switch to automatic commissioning.<br>Third, start the "feed" button<br>(1) the lifter and the upper stir-up dragon and the bulker, the next stir-up dragon sequence start, observe whether there are any abnormalities;<br>(2) check each operating site for abnormal noise;
正在翻译中..