Recovery processThe recovery process is activated once T1's production control is strengthened and the quality management issue at their facility is resolved. The purpose of the 3rd party inspection is to ensure that T1 immediately addresses any quality management issue. The following are the criteria that must be met to stop the 3rd party inspection:a) The 3rd party inspection (finished product) could be stopped when the following criteria aremet:• T1 achieves a consecutively high Acceptable Quality Level (AQL) validation result of 97% for two months, with AQL validation only counting for the recovery process when 3rd party inspection is involved.• And/or T1 shows a good trend of pass rate consecutively increasing over three months by more than 10%, toward a target of 97%. Once the pass rate is equal to or greater than 97%, T1 can be removed from 3rd party inspection