Thank you for the pictures you’ve provided to us.- The attached picture shows the installation of the piping which is incorrect. Height of piping from/to this area has to be increased.- The hole has to be provided with covers suitable to support heavy duty traffic. Please refer to drawing B001A004 rev. 0 attached.Configuration as it is now, doesn’t permit an adquate maintenance.