The soil layer with lower permeability is located under the soil layer with higher permeability, so the surface of the soil layer with lower permeability should be made into a slope of not less than 4% from the filling axis to both sides. If the soil layer with higher permeability is under the soil layer with lower permeability, the surface of the soil layer with higher permeability should be made into a platform. In order to prevent rain erosion, the soil layer with low permeability can be covered. The use of natural mixtures of the above mentioned soils in the borrow area is permitted. Water soil and impervious soil should not be used in layers to avoid the formation of water pockets in the fill.<br>