5.7 Handling and Loading Ensure adequate drying / curing period for each coat before handling. Ensure suitable lifting hardness’s nylon slings to minimize chipping and other handling damages. Ensure proper stacking on wooden blocks.5.8 Health and Safety All personnel involved in the project to carry out paining work for which they are responsible in such a manner that they do not endanger the health and safety of themselves and others. In pursuance of one’s duty, each party shall ensure that any of their work is to be carried out are complied with. Items that need particular attention are – o Reduction of emission of volatile compounds. o Caution while using toxic or carcinogenic substances. o Measures against harmful effects of fumes, dust, vapors and noise, as well as fire hazard. o Protection of body, including the eyes, the skin, the ears and the respiratory system. o Protection of water and soil during corrosion protection. o Recycling of materials and waste disposal.