1. The crushing principle is: with the pressure, first quiet and then vibration, first slow and then fast, first low after high.<br>2. The crushing is divided into three stages: primary pressure, re-pressure and final pressure.<br>3. The initial pressure uses YZ18 vibration roller to shut down the vibration for crushing. The number of crushing passes is two times, and the crushing speed is controlled at 1.5 to 2Km/h. Stabilize the mixture, get the initial compaction, reduce the push and push in the process of repressing.<br>4. Repress is the main process of cement stabilization gravel pavement compaction, is the key to make the whole road surface fully thick and compact, to achieve the prescribed compaction degree. The use of high-frequency, low amplitude crushing, the number of crushing passes for 3 to 4 times, the speed does not exceed 3Km/h. In the process of crushing, the test personnel use sand irrigation method to detect the growth of compaction at any time, crushing to qualified.<br>5. Final pressure using light wheel roller crushing, the number of crushing passes according to the concrete surface conditions are generally 6 to 8 times, the crushing speed is 4 to 6Km/h. Eliminate cracking cracks and crushed wheel sashimi during paving or repressurization, making the grass surface more dense.<br>6. In the process of crushing, the front and rear wheels of the roller should overlap 1/3 wheel width, so as to avoid leakage or uneven crushing at the seam. After each crushing is completed, the sand-filling method is used for compaction testing until the crush is to a suitable compaction degree. 5% cement stabilization grade with gravel base compaction degree of 98%, 4% cement stabilization grade with gravel base base compaction degree of 97%.<br>7. In the process of crushing, such as the appearance of "spring", the use of open drying or filling the method of new material treatment, but should ensure that the minimum thickness is not less than 10 cm, is strictly prohibited to paste thin layer.<br>8. Grinding precautions:<br>(1) The regulation must be carried out within the whole section to prevent local leakage pressure;<br>(2) In the process of crushing, the roller must keep moving at a uniform speed, strictly prohibit sudden start or emergency braking, to avoid the mixing material to produce a movement, so as not to affect the flatness;<br>(3) The roller parking space must be ladder-like and must not be on the same section;<br>(4) It is strictly forbidden for the roller to stop or turn around at the grass-roots level that has not been crushed;<br>(5) Non-crushing machinery is prohibited from walking on the road surface that has not been crushed;
正在翻译中..