1.碾压原则为:随铺随压,先静后振,先慢后快,先低处后高处。2.碾压分为初压、复压和终压三个阶段。3.初压采用YZ18震动压路机关闭震动进行的英语翻译

1.碾压原则为:随铺随压,先静后振,先慢后快,先低处后高处。2.碾压分

1.碾压原则为:随铺随压,先静后振,先慢后快,先低处后高处。2.碾压分为初压、复压和终压三个阶段。3.初压采用YZ18震动压路机关闭震动进行碾压。碾压遍数为两遍,碾压速度控制在1.5~2Km/h。使混合料稳定,得到初步的压实,减少复压过程中的推挤。4.复压是水泥稳定碎石路面压实的主要工序,是使整个路面全厚密实、达到规定压实度的关键。采用高频、低振幅碾压,碾压遍数为3~4遍,速度不超过3Km/h。碾压过程中试验人员采用灌砂法随时检测压实度增长情况,碾压至合格。5.终压采用光轮压路机碾压,碾压遍数根据混凝土表面情况一般为6~8遍,碾压速度为4~6Km/h。消除摊铺或复压时出现的拉裂裂纹和碾压轮迹,使基层表面更加致密。6.碾压过程中,压路机前后轮迹应重叠1/3轮宽,避免漏压或接缝处碾压不密实。每遍碾压完成后,都采用灌砂法进行压实度检测,直至碾压到合适的压实度时为止。5%水泥稳定级配碎石基层压实度≥98%,4%水泥稳定级配碎石底基层压实度≥97%。7.碾压过程中如出现“弹簧”,采用翻开晾晒或换填新料的方法处理,但应保证最小厚度不小于10厘米,严禁贴薄层。8.碾压注意事项:①稳压必须在全断面内进行,防止局部漏压;②碾压过程中,压路机必须保持匀速前进,严禁突然启动或紧急刹车,避免对混合料产生推移,以免影响平整度;③压路机停机位必须成阶梯状,不得在同一断面上;④严禁压路机在未碾压完成的基层上停车或调头;⑤未碾压完成的路面上禁止非碾压机械行走;
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1. rolling principles: with the shop with the press, after the first static vibration, the first slow after the fast, at first low after the high. <br>2. Rolling into initial pressure and final pressure re-pressed three stages. <br>3. The use of early pressure vibration roller YZ18 be rolling off vibration. It rolled several times to twice, rolling speed control 1.5 ~ 2Km / h. So that the mixture is stable, preliminary compaction, complex pressure reduction during pushing. <br>4. The main process is re-pressed cement stabilized gravel road compaction, the entire road is full-thickness dense, reaches a predetermined degree of compaction of the key. High-frequency, low-amplitude rolling, rolled several times is 3 to 4 times, speed does not exceed 3Km / h. Rolling process of testing personnel at any time using sand replacement method to detect the degree of compaction growth, rolling to qualified. <br>The final pressure roller wheel by light rolling, rolled several times according to the surface condition of the concrete is generally 6-8 times, rolling speed of 4 ~ 6Km / h. Occur when paving or eliminate cracking and fracturing pressure recovery wheel rolling tracks the substrate surface more compact. <br>6. The rolling process, the front and rear wheels track roller should overlap the third wheel width, to avoid leakage or pressure rolling seams not dense. After completion of each pass rolling, sand replacement method are used for detecting the degree of compaction, until when laminated to a suitable degree of compaction. 5% cement stabilized graded gravel Base Compactness ≥98%, 4% cement stabilized graded gravel bottom Base Compactness ≥97%. <br>7. The rolling process, such as a "spring", open drying method or process Replacement of new material, but should ensure a minimum thickness of not less than 10 cm, a thin layer of non-stick. <br>8. RCC Note: <br>① regulator must be in full-face, to prevent local leakage pressure; <br>② rolling process, the roller must move uniformly, non-sudden start or emergency brake, to avoid the passage of the mix, so as not to affect flatness; <br>③ roller bits must be stepped down, not in the same section; <br>; ④ prohibited roller rolling on a non-complete stop or turn around the base layer <br>prohibit rolling machinery running on a non-rolling ⑤ not completed road;
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1. The crushing principle is: with the pressure, first quiet and then vibration, first slow and then fast, first low after high.<br>2. The crushing is divided into three stages: primary pressure, re-pressure and final pressure.<br>3. The initial pressure uses YZ18 vibration roller to shut down the vibration for crushing. The number of crushing passes is two times, and the crushing speed is controlled at 1.5 to 2Km/h. Stabilize the mixture, get the initial compaction, reduce the push and push in the process of repressing.<br>4. Repress is the main process of cement stabilization gravel pavement compaction, is the key to make the whole road surface fully thick and compact, to achieve the prescribed compaction degree. The use of high-frequency, low amplitude crushing, the number of crushing passes for 3 to 4 times, the speed does not exceed 3Km/h. In the process of crushing, the test personnel use sand irrigation method to detect the growth of compaction at any time, crushing to qualified.<br>5. Final pressure using light wheel roller crushing, the number of crushing passes according to the concrete surface conditions are generally 6 to 8 times, the crushing speed is 4 to 6Km/h. Eliminate cracking cracks and crushed wheel sashimi during paving or repressurization, making the grass surface more dense.<br>6. In the process of crushing, the front and rear wheels of the roller should overlap 1/3 wheel width, so as to avoid leakage or uneven crushing at the seam. After each crushing is completed, the sand-filling method is used for compaction testing until the crush is to a suitable compaction degree. 5% cement stabilization grade with gravel base compaction degree of 98%, 4% cement stabilization grade with gravel base base compaction degree of 97%.<br>7. In the process of crushing, such as the appearance of "spring", the use of open drying or filling the method of new material treatment, but should ensure that the minimum thickness is not less than 10 cm, is strictly prohibited to paste thin layer.<br>8. Grinding precautions:<br>(1) The regulation must be carried out within the whole section to prevent local leakage pressure;<br>(2) In the process of crushing, the roller must keep moving at a uniform speed, strictly prohibit sudden start or emergency braking, to avoid the mixing material to produce a movement, so as not to affect the flatness;<br>(3) The roller parking space must be ladder-like and must not be on the same section;<br>(4) It is strictly forbidden for the roller to stop or turn around at the grass-roots level that has not been crushed;<br>(5) Non-crushing machinery is prohibited from walking on the road surface that has not been crushed;
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1. Rolling principle: laying and rolling, first static and then vibration, first slow and then fast, first low and then high.<br>2. Rolling is divided into three stages: initial rolling, re rolling and final rolling.<br>3. The YZ18 vibration roller is used for initial compaction to turn off the vibration for rolling. The rolling times are two times, and the rolling speed is controlled at 1.5-2km/h. Make the mixture stable, get the initial compaction, reduce the push in the process of re compaction.<br>4. Re compaction is the main process of cement stabilized macadam pavement compaction, and it is the key to make the whole pavement full thickness dense and reach the specified compaction degree. High frequency and low amplitude rolling shall be adopted, and the rolling times shall be 3-4, and the speed shall not exceed 3km / h. During the rolling process, the test personnel shall use sand filling method to detect the increase of compactness at any time and roll until it is qualified.<br>5. The final rolling is carried out by smooth wheel roller. The rolling times are generally 6-8 times according to the concrete surface conditions, and the rolling speed is 4-6km / h. Eliminate the cracks and roller tracks during paving or re compaction, and make the base surface more compact.<br>6. In the rolling process, the front and rear wheel tracks of the roller shall be overlapped by 1 / 3 of the wheel width to avoid missed rolling or uncompacted rolling at the joints. After each rolling, the sand filling method shall be used to detect the degree of compaction until the proper degree of compaction is reached. 5% Cement Stabilized Graded Crushed Stone Base compactness ≥ 98%, 4% Cement Stabilized Graded Crushed Stone Subbase compactness ≥ 97%.<br>7. If "spring" appears during rolling, turn it over for drying or replace with new material, but the minimum thickness shall not be less than 10cm, and it is strictly prohibited to stick thin layer.<br>8. Rolling precautions:<br>① The pressure stabilization must be carried out in the whole section to prevent local pressure leakage;<br>② In the rolling process, the roller must keep moving at a constant speed, and it is strictly prohibited to start suddenly or brake in an emergency to avoid the displacement of the mixture, so as not to affect the flatness;<br>③ The roller stand must be stepped and not on the same section;<br>④ It is strictly prohibited for the roller to stop or turn around on the uncompleted base;<br>⑤ Non rolling machines are not allowed to walk on the uncompleted pavement;
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.