第一步:挖斗电机和减速机带动挖斗从河道内采掘矿物料,通过升降绞车控制水下大臂升降,以采掘不同深度的矿物料;通过船体移动绞车控制船体前进、后退的英语翻译

第一步:挖斗电机和减速机带动挖斗从河道内采掘矿物料,通过升降绞车控制水

第一步:挖斗电机和减速机带动挖斗从河道内采掘矿物料,通过升降绞车控制水下大臂升降,以采掘不同深度的矿物料;通过船体移动绞车控制船体前进、后退及横移,从而扇形开采掘河道不同区域的矿物料。 第二步:挖斗将河道内的矿物料均匀提升到滚筒筛内(滚筒筛内部布满搅齿,骨架由车床件加工,坚固耐用,筛网为耐磨高锰钢材质,滚筒筛内部带冲水管,将矿物料充分洗选,外部也带冲水管,强力冲洗筛网,防止筛网堵塞,起到更好的筛分效果。矿物料首先进入滚筒筛的搅筒,在高压水的冲洗作用下,搅齿把矿物料充分搅散成为矿浆,然后再进入筛分系统,把矿物料洗干净后再进行筛分)。第三步:≤10mm的矿物料经滚筒筛接料斗进入二个溜槽内选矿,调整好溜槽角度、水流速,用进口三菱金毯回收金子。第四步:>10mm的矿物料经滚筒筛洗干净后直接排尾。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
The first step: the bucket motor and reducer drive the bucket to extract mineral materials from the river, and use the lifting winch to control the lifting of the underwater boom to extract mineral materials of different depths; use the hull moving winch to control the forward, backward and lateral movement of the hull , Thereby fan-shaped mining of mineral materials in different areas of the river. <br>Step 2: The digging bucket will evenly lift the mineral material in the river channel into the trommel (the trommel is full of stirring teeth, and the skeleton is processed by lathe parts, which is sturdy and durable. The screen is made of wear-resistant high manganese steel. The flushing pipe is used to fully wash the mineral materials. There is also a flushing pipe on the outside to flush the screen strongly to prevent the screen from clogging and achieve a better screening effect. The mineral material first enters the drum of the drum screen and is flushed with high-pressure water Under the action, the stirring teeth fully disperse the mineral material into slurry, and then enter the screening system to clean the mineral material before screening). <br>The third step: the mineral material ≤10mm enters the two chutes for ore beneficiation through the drum screen and the hopper, adjust the chute angle and water flow rate, and use the imported Mitsubishi gold carpet to recover gold. <br>The fourth step: the mineral material> 10mm is directly discharged after being cleaned by the drum screen.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Step 1: Digging motor and reducer drive the digger to extract mineral materials from the river, control the underwater arm lifting by lifting the winch, in order to extract mineral materials of different depths, and control the hull forward, backward and horizontal movement through the hull movement winch, so as to fan the mining of mineral materials in different areas of the river channel.<br> Step 2: Digging pipe will be the river inside the mineral material evenly raised to the drum sieve (roller sieve is covered with stirring teeth, skeleton by the bed parts processing, durable, screen for wear-resistant permanganese steel, roller sieve internal flush pipe, mineral material is fully washed, external also with flush pipe, strong flushing screen, prevent screen blockage, play a better screening effect.) The mineral material first enters the drum sieve, under the rinsing effect of high-pressure water, stirs the teeth to fully disperse the mineral material into the mineral slurry, and then enters the screening system, washes the mineral material clean and then sifts.<br>Step 3: The ore material of 10mm is sieved by the drum into the two chutes to select minerals, adjust the angle of the chute, the water flow rate, and recycle the gold with the imported Mitsubishi gold blanket.<br>Step 4: 10mm of mineral material is sieveed clean by the drum and then discharged directly.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
The first step: the bucket motor and reducer drive the bucket to extract mineral materials from the river. The lifting winch controls the lifting of the underwater boom to excavate mineral materials of different depths; the ship moves the winch to control the forward, backward and transverse movement of the hull, so as to fan-shaped mine the mineral materials in different areas of the river channel.<br>The second step: the bucket will evenly lift the mineral materials in the river channel into the drum screen (the inside of the drum screen is full of stirring teeth, and the framework is processed by lathe parts, so it is strong and durable. The screen screen is made of wear-resistant high manganese steel. There is a flushing pipe inside the drum screen to fully wash the mineral materials, and the external flushing pipe is also provided to strongly wash the screen to prevent the screen from blocking, so as to achieve better screening effect. Mineral materials first enter the drum of drum screen. Under the effect of high-pressure water, the stirring teeth fully disperse the mineral materials into pulp, and then enter the screening system to clean the mineral materials before screening).<br>The third step: mineral materials less than or equal to 10 mm are sent to two chutes for beneficiation through drum screen hopper. The angle of chute and water flow velocity are adjusted, and gold is recovered with imported Mitsubishi gold blanket.<br>Step 4: the mineral materials with the diameter of more than 10 mm are directly discharged after being cleaned by the drum screen.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: