10.1.4 Mold installation and commissioning on injection molding machine<br>The installation and commissioning of the mold in the injection molding machine includes pre-screening, lifting fastening, top-out distance adjustment and adjustment of the degree of tightness of the die-tight, as well as the installation and test-mode of the supporting parts such as heating lines and cooling pipes.<br>(1) Pre-screening<br>Before the mold installation, it should be inspected according to the mold assembly diagram to understand the basic structure of the mold, the working principle and the precautions.<br>(2) Lifting and fastening<br>First of all the injection molding machine all functions placed in the adjustment manual control state, according to the mold map indicated on the lifting position and direction, and in accordance with a certain lifting way to lift the mold (try to lift the mold as a whole).<br>(3) Mold lifting direction<br>The choice of mold lifting direction follows the following principles:<br>(1) When the mold has a lateral divider core pumping mechanism, try to place the slider in a horizontal position and move left and right in the horizontal face.<br>(2) When the mold length and width direction dimensions are largely different, the longer edge parallel sits parallel to the horizontal direction, which can effectively reduce the load of the guide rod at the time of opening the mold, and control the elastic deformation caused by the guide component due to the weight of the mold.<br><br>(3) When the mold has a hydraulic oil joint, pneumatic joint, hot runner component wiring board, as far as possible placed on the side of the non-operational side, to facilitate operation.
正在翻译中..