1. (N) Documentation shows inspection procedures, methods, and acceptance criteria.2. (N) Actual test results are recorded.3. (N) Operators are trained to know what to do when out of specification conditions exist.4. (N) Inspection performed and results obtained are traceable to the operator/inspector who took the measurements.5. (+) Inspection results are entered real-time into computer with automatic detection of out of specification results.6. (+) Results are entered into control charts for analysis and trending. "