Transportation shelf parts have been completed rectification, shelf protection to avoid scratching the distribution process, the follow-up turn-by-line control equipment GA
Parts transport shelves have been corrected, shelf protection to avoid the distribution process scratched, the problem followed by GA installation online control
The parts transportation shelf has been rectified, and the shelf protection can avoid scratches in the distribution process, and the subsequent problems will be transferred to GA online control<br>