All the materials needed to complete this project contract, by the bidder is responsible for the procurement, testing, testing, inspection, transportation and storage, etc., the cost has been included in the total contract price. <br>All materials purchased by the bidder for the contract drawings and projects shall comply with the relevant requirements specified in this contract, they have material proof, factory certification and so on. <br>Bidders are solely responsible for material procurement. <br>Supervision engineers have the right to require bidders to provide all material documents, factory certification, test report and the original material samples and so on. <br>Bidders supervision engineers use substandard materials in the project if it is found that indicates the bidder shall be replaced immediately supervision engineers, and the consequences arising therefrom responsible. <br>The bidder shall comply with the provisions manufacturing drawings and technical conditions of the tender documents, using qualified materials and technology to ensure product quality. <br>Once the supervision engineers found substandard quality of materials or workmanship, and issued a written notice, the bidder should immediately be replaced or changed, and bear the resulting losses and consequences.
正在翻译中..