• The requested ‘write accesses for the listed materials/drawings will be given with the exception of the drive (FA5) itself – production relevant drawings / no specific number system for samples. • The drive itself, as sample, we have to order in Hangzhou (usual procedure), adaptations in regards of damping (new variant) needs to be aligned and generated with R&D BLN – than to be available via Hangzhou.• I received information for new release of 245kV drive in Hangzhou, which may be suitable. This would be more streamlined in the portfolio and more cost effective, as far as I understood. I am supposed to receive additional detailed information, which I will share as soon as available.
• The requested ‘write accesses for the listed materials/drawings will be given with the exception of the drive (FA5) itself – production relevant drawings / no specific number system for samples. • The drive itself, as sample, we have to order in Hangzhou (usual procedure), adaptations in regards of damping (new variant) needs to be aligned and generated with R&D BLN – than to be available via Hangzhou.• I received information for new release of 245kV drive in Hangzhou, which may be suitable. This would be more streamlined in the portfolio and more cost effective, as far as I understood. I am supposed to receive additional detailed information, which I will share as soon as available.<br>
正在翻译中..