For sub-supplies included in the supply, the Vendor shall comply with PTT vendor list(refer to Attached Part C Section II Appendix C Approved Brand List). Vendor is responsible for the debugging, commissioning and operation of the full set ofinstrument control system for the hot oil package. The Vendor shall provide the supply in accordance with the requirements specified inthe documents listed at section 6 and 7 of this specification, including internationalstandards therein cited. The Vendor shall supply certified lifting beams and any required temporary fixtures forerection if necessary or required.