1.3.4System 4, conveyors and inspection station for bearingsThe bearing from pos. 2.24 will passing through following positions:-Pos. 4.1, one integrated conveyor with chain conveyor-Pos. 4.2, one roller conveyor-Pos. 4.3, one integrated conveyor with chain conveyor toward Laser Machine´s inlet conveyor One conveyor for transportation of bearings from Laser machine into a chain conveyor for changing direction toward inspection area pos. 4.7 or toward next operation in a opposite direction pos. 4.8One tilt to lifting the bearings to standing position in pos. 4.7One stable table of stainless-steel shield with a rotating disc to be able to check the clearance of bearings pos. 4.7One scale for weighting the bearing between pos. 4.6-4.7 to make sure that all components are completedOne conveyor toward next operation for sealed bearings in pos. 4.8Electrical installation, cabling, canalizationMechanical installation of all equipmentComplete CE-marking of system 4 Communication with other system PLC in shopfloor and SKF governess system