All discharge tests shall be terminated if the supplier's requested discharge voltage limits are reached. NOTE The remaining capacity will be measured within steps 2.6, 2.9 and 2.12 during the standard discharge (SDCH) test, which is the first part of the standard cycle (SC) test. 7.4.4 Requirement7.4.4.1 High-power battery system The remaining 1 C energy and SOC from the initial 80 % SOC shall be reported. The loss of energy and SOC after each rest period shall be expressed as a percentage of the initial 80 % SOC. The auxiliary energy consumption (12 V d.c. level) for the BCU and, if required for other battery system electronics, shall be expressed in watt hours (Wh) for each rest period. A graph, including data for the three rest periods and the two test temperatures, showing residual capacity versus rest period, shall be presented.