The subject of this paper is a special construction plan for the formwork support of the tunnel under Huanhubei Road. According to the box girder structure size and load size, the construction plan preliminarily designs the structure diagram of the full-floor support, checks the bearing capacity and deflection of the template support, and then compiles the full-floor support The construction schedule plan, according to the schedule, prepares a resource demand plan for manpower, materials, and machinery, and then introduces in detail the main construction methods such as bracket erection, preloading, and dismantling, and finally prepares the bracket construction quality, safety, civilization assurance measures and emergency plans, etc., at the same time , According to the various requirements of the task book, write a formwork support plan that is economical and practical, and can meet the requirements of safe construction. <br>The cross-section size of the tunnel under Huanhubei Road is 1200mm, and the clearance size is 1000mm. The tunnel structure adopts reinforced concrete structure, and the concrete number is C40P8 waterproof concrete. The layout adopts a full-floor bracket, and uses related formulas for checking calculations to check the strength, stress, and deflection of the bearing capacity of the bracket in the ultimate state, so that the final check result meets the requirements of the specification.
正在翻译中..