The QMS system of the bottom factory IP is equipped with 3 tablets per line, but because of the 24-hour shift, you need to change the tablet, so each line requires 6 tablets ... First order half to see how the result is
The QMS system of the plant IP is with 3 plates per line, but because of the 24-hour shift, to change the flat plate so each line to 6 flat plates... Book half to see what the results are like.
The QMS system of IP in the bottom factory is equipped with 3 flat plates for each line, but because of the 24-hour shift, the flat plate needs to be changed, so each line needs 6 flat plates... First order half to see the result<br>