1)根据电力系统规划要求,综合考虑线路长度、地形地貌、地质、水文气象、冰区、规划、交通、林木、矿产、障碍设施、交叉跨越、施工、运行等因素,进的英语翻译

1)根据电力系统规划要求,综合考虑线路长度、地形地貌、地质、水文气象、

1)根据电力系统规划要求,综合考虑线路长度、地形地貌、地质、水文气象、冰区、规划、交通、林木、矿产、障碍设施、交叉跨越、施工、运行等因素,进行技术经济比较,使路径走向安全可靠,经济合理。2)结合电网规划,通盘布局线路走廊。按照近、远期电网发展规划,结合地方有关规划,充分应用电力设施布局规划成果,以综合走廊效益最优为原则,充分利用沿河流、道路等通道条件,利用其绿化带,归并、整合、集中线路走廊,尽可能作到线路路径短捷、顺直。3)对于变电站出线段,应作出详细的出线规划,结合所址附近的实际情况归并走廊,推广同塔多回技术,提高单位走廊输送容量和土地资源利用率。4)应避开军事设施、大型工矿企业及重要设施等,符合城镇规划。5)宜避开风景名胜区、水源保护区、自然保护区、文物保护区,无法避让时,应配合建设单位做好专项评估和报批工作。6)应避开不良地质地带。特别是避让滑坡、漫滩河流地段以及其严重影响安全运行的地区,充分全面考虑沿线地质、水文条件及地形对线路可靠性和经济性的影响。7)考虑方便施工运行。路径选择尽量靠近现有公路,合理选择交叉跨越点:充分考虑地形、地貌对线路路径的影响,避免大档距、大高差,避开高山大岭、严重覆冰地段和微地形地段,确保线路安全可靠运行。8)线路路径要充分考虑对邻近电台、机场、弱电线路等通信无线电设施的相互影响。9)单回线路开断环入变电站时,一般采用同塔双回路。如两环入线路分别架设,宜采用两个同塔双回路,其中预留两回线路。10)对因线路路径受限制而需采用钢管杆、电缆时,应遵照相关要求。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
1) According to the requirements of power system planning, comprehensively consider factors such as line length, topography, geology, hydrometeorology, ice area, planning, transportation, forests, minerals, obstacle facilities, crossing, construction, operation, etc., and make technical and economic comparisons. The path is safe, reliable, and economical. <br>2) Layout of route corridors in combination with grid planning. In accordance with the short-term and long-term power grid development plans, combined with relevant local plans, fully apply the results of power facility layout planning, and take the principle of optimal comprehensive corridor benefits as the principle, make full use of channel conditions along rivers and roads, and use its green belts to merge and integrate , Concentrate the line corridor, make the line path as short and straight as possible. <br>3) For the outgoing section of the substation, a detailed outgoing line plan should be made, and the corridors should be merged according to the actual situation near the site, and the technology of multiple circuits on the same tower should be promoted to improve the transmission capacity of the unit corridor and the utilization rate of land resources. <br>4) Military facilities, large industrial and mining enterprises and important facilities should be avoided, in line with town planning. <br>5) It is advisable to avoid scenic spots, water source protection areas, nature reserves, and cultural relics protection areas. When it is unavoidable, the construction unit shall cooperate with the construction unit to do a special assessment and report for approval. <br>6) Avoid bad geological zones. In particular, to avoid landslides, floodplain river sections and areas that seriously affect safe operation, fully consider the impact of geological, hydrological conditions and topography along the line on the reliability and economy of the line. <br>7) Consider facilitating construction and operation. Route selection as close as possible to existing highways, and reasonably select crossing points: fully consider the impact of terrain and landform on the route path, avoid large distances, large elevation differences, avoid high mountains, large ridges, severe icing areas, and small terrain areas to ensure The line runs safely and reliably. <br>8) The route of the line should fully consider the mutual influence on the communication and radio facilities such as neighboring radio stations, airports, and weak current lines. <br>9) When a single circuit circuit breaks into a substation, generally adopts double circuits on the same tower. If the incoming lines of the two loops are set up separately, two double circuits on the same tower should be used, and two circuits should be reserved. <br>10) When steel poles and cables are required due to restricted line paths, relevant requirements should be followed.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
1) According to the planning requirements of the power system, comprehensive consideration of line length, topography, geology, hydrometeorology, ice areas, planning, transportation, forestry, minerals, obstacle facilities, cross-crossing, construction, operation and other factors, to carry out technical and economic comparison, so that the path towards safety and reliability, economic rationality.<br>2) Combined with power grid planning, the overall layout of the line corridor. In accordance with the near and long-term power grid development plan, combined with local planning, fully apply the results of power facilities layout planning, to the principle of optimal efficiency of integrated corridors, make full use of the conditions along rivers, roads and other channels, make use of its green belt, integration, integration, centralized line corridor, as far as possible to the line path short and straight.<br>3) For the substation line section, a detailed line plan should be made, combined with the actual situation near the site of the integration corridor, the promotion of the same tower multi-back technology, improve the unit corridor transport capacity and land resource utilization rate.<br>4) Military facilities, large industrial and mining enterprises and important facilities should be avoided, in line with urban planning.<br>5) It is advisable to avoid scenic spots, water conservation areas, nature reserves, cultural relics protection areas, can not avoid concessions, should cooperate with the construction units to do a good job of special assessment and approval work.<br>6) Avoid bad geological zones. In particular, landslide avoidance, flood river sections and areas that seriously affect the safe operation of the river, fully consider the geological, hydrological conditions and terrain along the line on the reliability and economy of the line.<br>7) Consider convenient construction operation. Path selection as close as possible to existing roads, reasonable choice of cross-crossing points: fully consider the terrain, geomorphology on the route path, avoid large gear distance, large high difference, avoid mountain ridges, severe ice cover and micro-terrain, to ensure the safe and reliable operation of the line.<br>8) Line paths should take full account of the mutual influence on communication radio facilities such as adjacent radio stations, airports and weak power lines.<br>9) When a single return line opens and breaks the ring into the substation, the same tower double circuit is generally used. If the two ring incoming lines are set up separately, it is advisable to use two double circuits with the same tower, wherein two lines are reserved.<br>10) When steel pipe rods and cables are required due to the restriction of the route path, the relevant requirements shall be followed.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
1) According to the requirements of power system planning, considering the line length, topography, geology, hydrometeorology, ice area, planning, transportation, trees, minerals, obstacle facilities, crossing, construction, operation and other factors, the technical and economic comparison is carried out to make the route safe, reliable and reasonable.<br>2) Combined with the power grid planning, the overall layout of the line corridor. According to the short-term and long-term power grid development planning, combined with the relevant local planning, make full use of the planning results of power facilities layout, take the optimal benefit of comprehensive corridor as the principle, make full use of the channel conditions along rivers and roads, and use their green belts to merge, integrate and concentrate the line corridors, so as to make the line path as short and straight as possible.<br>3) For the outgoing line of the substation, detailed outgoing line planning should be made, combined with the actual situation near the site, the corridor should be merged, the multi circuit technology on the same tower should be promoted, and the transmission capacity of the unit corridor and the utilization rate of land resources should be improved.<br>4) Military facilities, large-scale industrial and mining enterprises and important facilities should be avoided to conform to urban planning.<br>5) It is advisable to avoid scenic spots, water source protection areas, nature reserves and cultural relics protection areas. When it is impossible to avoid, it is necessary to cooperate with the construction unit to do a good job in special assessment and approval.<br>6) We should avoid the bad geological zone. In particular, to avoid landslides, floodplain river sections and the areas that seriously affect the safe operation, we should fully consider the impact of geological, hydrological conditions and topography along the line on the reliability and economy of the line.<br>7) It is considered to be convenient for construction and operation. The route selection should be close to the existing highway as far as possible, and the crossing point should be reasonably selected: the influence of terrain and landform on the route should be fully considered, the large span and height difference should be avoided, and the high mountains, severe icing section and micro terrain section should be avoided, so as to ensure the safe and reliable operation of the line.<br>8) The interaction between adjacent radio stations, airports, weak current lines and other communication radio facilities should be fully considered.<br>9) When the single circuit line breaks into the substation, the double circuits on the same tower are generally used. If the two ring incoming lines are erected separately, two double circuits on the same tower should be adopted, in which two circuits are reserved.<br>10) When the steel pipe pole and cable are needed due to the limitation of the route, the relevant requirements shall be followed.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: