1) According to the planning requirements of the power system, comprehensive consideration of line length, topography, geology, hydrometeorology, ice areas, planning, transportation, forestry, minerals, obstacle facilities, cross-crossing, construction, operation and other factors, to carry out technical and economic comparison, so that the path towards safety and reliability, economic rationality.<br>2) Combined with power grid planning, the overall layout of the line corridor. In accordance with the near and long-term power grid development plan, combined with local planning, fully apply the results of power facilities layout planning, to the principle of optimal efficiency of integrated corridors, make full use of the conditions along rivers, roads and other channels, make use of its green belt, integration, integration, centralized line corridor, as far as possible to the line path short and straight.<br>3) For the substation line section, a detailed line plan should be made, combined with the actual situation near the site of the integration corridor, the promotion of the same tower multi-back technology, improve the unit corridor transport capacity and land resource utilization rate.<br>4) Military facilities, large industrial and mining enterprises and important facilities should be avoided, in line with urban planning.<br>5) It is advisable to avoid scenic spots, water conservation areas, nature reserves, cultural relics protection areas, can not avoid concessions, should cooperate with the construction units to do a good job of special assessment and approval work.<br>6) Avoid bad geological zones. In particular, landslide avoidance, flood river sections and areas that seriously affect the safe operation of the river, fully consider the geological, hydrological conditions and terrain along the line on the reliability and economy of the line.<br>7) Consider convenient construction operation. Path selection as close as possible to existing roads, reasonable choice of cross-crossing points: fully consider the terrain, geomorphology on the route path, avoid large gear distance, large high difference, avoid mountain ridges, severe ice cover and micro-terrain, to ensure the safe and reliable operation of the line.<br>8) Line paths should take full account of the mutual influence on communication radio facilities such as adjacent radio stations, airports and weak power lines.<br>9) When a single return line opens and breaks the ring into the substation, the same tower double circuit is generally used. If the two ring incoming lines are set up separately, it is advisable to use two double circuits with the same tower, wherein two lines are reserved.<br>10) When steel pipe rods and cables are required due to the restriction of the route path, the relevant requirements shall be followed.
正在翻译中..