p) delay test times.13.8 Clock and calendarA means should be provided to mark data collected by the gauge with time and date, using an on-site clock unit that is either part of the gauge instrumentation, or as part of a separate telemetry system.13.9 System performance criteria13.9.1 GeneralThe principal system performance criteria should be defined by the prospective user, within the technical limits described in this document, and those of current technology.