2、车门控制器线束插头松脱的问题已制定措施,并验证有效;3、车门升降器安装板钣金棱增加硫化胶条措施评估未回复;4、白车身与车门线束干涉点增加的英语翻译

2、车门控制器线束插头松脱的问题已制定措施,并验证有效;3、车门升降器

2、车门控制器线束插头松脱的问题已制定措施,并验证有效;3、车门升降器安装板钣金棱增加硫化胶条措施评估未回复;4、白车身与车门线束干涉点增加硫化胶条措施评估未回复;5、车门玻璃上导轨与车门钣金安装孔对不上问题暂未得到有效措施回复。需推动事项:1、推动研发尽快评估与车门线束干涉的钣金部位增加硫化胶条的措施可行性,并制定相关的改进计划。2、推动研发尽快到生产现场落实上导轨空位偏差问题,并制定改进措施。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
2. Measures have been formulated for the loosening of the wiring harness plug of the door controller, and have been verified to be effective; <br>3. The evaluation of measures to add vulcanized rubber strips to the sheet metal ridges of the door lifter mounting plate has not been answered; <br>4. The interference points of the body-in-white and the door wiring harnesses increase vulcanized The evaluation of the measures has not been replied; <br>5. The problem that the guide rail on the door glass is not aligned with the mounting hole of the door sheet metal has not been responded to by effective measures. Items to <br>be promoted: <br>1. Promote R&D to evaluate the feasibility of adding vulcanized rubber strips to the sheet metal parts that interfere with the door harness as soon as possible, and formulate related improvement plans. <br>2. Promote R&D to the production site as soon as possible to implement the problem of the upper rail vacancy deviation and formulate improvement measures.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
2, the door controller harness plug loose problem has been formulated measures, and verify effective;<br>3, door lift installation plate sheet metal prism increase vulcanized rubber strip measures assessment did not reply;<br>4, white body and door harness interference point increase vulcanized strip measures assessment did not reply;<br>5, door glass on the rail and door sheet metal mounting hole on the problem has not been effective measures to reply.<br>Things to push:<br>1, promote research and development as soon as possible to assess the door harness interference with the sheet metal site to increase the feasibility of vulcanized strip measures, and formulate relevant improvement plans.<br>2, promote research and development as soon as possible to the production site to implement the rail space deviation problem, and formulate improvement measures.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
2. Measures have been formulated and verified to be effective for the problem of door controller harness plug loosening;<br>3. The evaluation on the measures of adding vulcanizate strip to the metal edge of the mounting plate of the door lifter did not reply;<br>4. No reply was made to the evaluation on the measures of adding vulcanizate strip at the interference point between BIW and door harness;<br>5. No effective measures have been taken to solve the problem that the upper guide rail of the door glass and the mounting hole of the door sheet metal do not match.<br>Matters to be promoted:<br>1. Promote research and development, evaluate the feasibility of adding vulcanizate strips to the sheet metal parts that interfere with the door harness as soon as possible, and formulate relevant improvement plans.<br>2. Promote R & D to the production site as soon as possible to implement the problem of upper guide rail vacancy deviation, and formulate improvement measures.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: