2, the door controller harness plug loose problem has been formulated measures, and verify effective;<br>3, door lift installation plate sheet metal prism increase vulcanized rubber strip measures assessment did not reply;<br>4, white body and door harness interference point increase vulcanized strip measures assessment did not reply;<br>5, door glass on the rail and door sheet metal mounting hole on the problem has not been effective measures to reply.<br>Things to push:<br>1, promote research and development as soon as possible to assess the door harness interference with the sheet metal site to increase the feasibility of vulcanized strip measures, and formulate relevant improvement plans.<br>2, promote research and development as soon as possible to the production site to implement the rail space deviation problem, and formulate improvement measures.
正在翻译中..