From the current basic construction procedures, feasibility study, put forward project proposals, after approval, the construction party commissioned the corresponding qualified design units for preliminary design, design units according to the function of the project and its requirements, to initially determine the project's overall plan, monos, as well as related supporting planning, in order to achieve the function of the project, in such a preliminary design, most of the planners, architects and related professional engineers to complete, and the cost engineers rarely involved, because the implementation of the people do not have cost expertise, The factors affecting the cost of the project are naturally incomplete, often easy to cause some unnecessary waste, such as due to differences in geological conditions, due to differences in structural selection, the difference in the balance of soil and stone in the field caused by unnecessary increases and waste of the project cost, if the initial design phase is followed up by the engineering cost consulting body, can avoid the above reasons caused by waste, so as to truly reflect the macro-control, micro-guaranteed engineering cost control concept
正在翻译中..