从现行的基本建设程序上讲,可行性研究后,提出项目建议,审批后,建设方委托有相应资格的设计单位进行初步设计,设计单位根据项目的功能及其要求,来的英语翻译

从现行的基本建设程序上讲,可行性研究后,提出项目建议,审批后,建设方委

从现行的基本建设程序上讲,可行性研究后,提出项目建议,审批后,建设方委托有相应资格的设计单位进行初步设计,设计单位根据项目的功能及其要求,来初步确定项目的总图规划、单体、以及相关的配套规划,以达到项目的功能,在这样的初步设计中,多数是由规划师、建筑师及相关专业的工程师来完成,而造价工程师很少介入,由于实施的人不具备造价专业知识,对影响工程造价方面的因素考虑自然不全面,往往容易造成一些不必要的浪费,如由于地质条件的差异、由于结构选型的差异、场内土石方平衡的差异等造成的工程造价不必要的增加和浪费,如果初步设计阶段即由工程造价咨询机构跟进项目的进行,可以避免以上等原因造成的浪费,这样才可以真正体现宏观控制、微观保证的工程造价控制理念
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
From the current basic construction procedures, after the feasibility study, the project proposal is put forward, and after approval, the construction party entrusts a qualified design unit to carry out the preliminary design. The design unit preliminarily determines the overall project according to the function and requirements of the project Diagram planning, single unit, and related supporting planning to achieve the function of the project. In this preliminary design, most of the preliminary design is completed by planners, architects and related professional engineers, and cost engineers rarely intervene. The people who do not have the professional knowledge of cost, the factors that affect the project cost are naturally not comprehensive, and they are often prone to unnecessary waste, such as differences in geological conditions, differences in structure selection, differences in the balance of earth and stone in the site, etc. The unnecessary increase and waste of the project cost caused by the project cost consulting agency in the preliminary design stage can avoid the waste caused by the above reasons, so that the project cost control of macro-control and micro-guarantee can be truly reflected. idea
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
From the current basic construction procedures, feasibility study, put forward project proposals, after approval, the construction party commissioned the corresponding qualified design units for preliminary design, design units according to the function of the project and its requirements, to initially determine the project's overall plan, monos, as well as related supporting planning, in order to achieve the function of the project, in such a preliminary design, most of the planners, architects and related professional engineers to complete, and the cost engineers rarely involved, because the implementation of the people do not have cost expertise, The factors affecting the cost of the project are naturally incomplete, often easy to cause some unnecessary waste, such as due to differences in geological conditions, due to differences in structural selection, the difference in the balance of soil and stone in the field caused by unnecessary increases and waste of the project cost, if the initial design phase is followed up by the engineering cost consulting body, can avoid the above reasons caused by waste, so as to truly reflect the macro-control, micro-guaranteed engineering cost control concept
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
In terms of the current capital construction procedure, after the feasibility study, the project proposal is put forward, and after the approval, the construction party entrusts the design unit with corresponding qualification to carry out the preliminary design. According to the functions and requirements of the project, the design unit preliminarily determines the general layout planning, monomer planning and relevant supporting planning of the project, so as to achieve the functions of the project. In such preliminary design, most of the design units are qualified It is completed by planners, architects and related professional engineers, but cost engineers rarely intervene. Because the implementers do not have the cost professional knowledge, the consideration of factors affecting the project cost is not comprehensive, and it is easy to cause some unnecessary waste, such as differences in geological conditions, differences in structure selection, differences in earthwork balance, etc If the preliminary design stage is followed up by the project cost consulting agency, the waste caused by the above reasons can be avoided, so as to truly reflect the concept of macro control and micro guarantee of project cost control
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: