Today is the 21st, I need to get the pre-allocation right away, and then arrange the truck to empty the container. This takes time. <br>As for the second 20, the completion time is AUG 27.
It's the 21st today, I need to get the pre-provision right away, and then arrange for the truck to pick up the empty cabinet, which will take time,<br>As for the second 20, the completion time is AUG 27, the cabinet.
Today is the 21st. I need to get the pre configuration immediately and arrange the truck to pick up the empty cabinet. This will take time,<br>As for the second 20, the completion time is Aug 27<br>