本篇论文主要是为农垦金地花园15#楼施工组织设计提供施工依据,对于施工总工期、计划开工日期、施工质量、轻重机械设备、施工人员配备、工程进度计的英语翻译

本篇论文主要是为农垦金地花园15#楼施工组织设计提供施工依据,对于施工

本篇论文主要是为农垦金地花园15#楼施工组织设计提供施工依据,对于施工总工期、计划开工日期、施工质量、轻重机械设备、施工人员配备、工程进度计划控制、还有施工材料的选择,以及建筑工地绿色文明施工、环境保护进行了论述说明,主要以实际情况为基础,绝大多数需要考虑的因素都包含在内,力求施工组织设计有科学依据能跟顺利进行。关键词:施工措施;质量管理;工程保障
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
This paper is mainly to provide construction basis for the construction organization design of Building 15 # of Nongkenjindi Garden. The total construction period, planned start date, construction quality, light and heavy mechanical equipment, construction staffing, project schedule control, and construction material selection , And the construction site green civilization construction and environmental protection are discussed and explained, mainly based on the actual situation, most of the factors that need to be considered are included, and strive to have a scientific basis for construction organization design to proceed smoothly. <br><br>Keywords: construction measures; quality management; engineering guarantee
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
This paper is mainly for the construction of the agricultural garden 15 building construction organization design to provide the construction basis, for the total construction period, planning start date, construction quality, light and heavy machinery and equipment, construction staffing, project schedule control, as well as the choice of construction materials, as well as construction site green civilization construction, environmental protection has been discussed, mainly based on the actual situation, the vast majority of factors to be considered are included, and strive to build the organization design scientific basis with smooth progress.<br><br>Keywords: construction measures;
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
This paper mainly provides the construction basis for the construction organization design of the 15 ා building of the farmland garden. It discusses the total construction period, planned commencement date, construction quality, light and heavy machinery equipment, construction personnel allocation, project schedule control, and the selection of construction materials, as well as the green and civilized construction and environmental protection of the construction site, mainly based on the actual situation Most of the factors that need to be considered are included, so as to ensure that the construction organization design can be carried out smoothly with scientific basis.<br>Key words: construction measures; quality management; engineering support
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: