The temporary electricity application scheme requires that the electrical engineering professional and technical personnel be prepared, and approved by the technical person in charge of the construction unit and the supervising engineer before it can be put into construction.<br> 2. The temporary electricity system shall be put into use only after the completion of the construction, the preparer, the project manager, the approver and the full-time electrician and supervising engineer, after the joint acceptance and acceptance, and the acceptance shall standardize the procedures for the implementation of the seal.<br> 3. Set up a sound temporary electricity technology file on site, and set up a special person to manage for inspection at all levels, the contents of the information mainly include: special temporary electricity program, site all ground resistance test records, wire and cable insulation resistance test records, electrical cycle inspection and maintenance records, temporary electricity sub-item acceptance records.
正在翻译中..