(4) The grass-roots treatment of fluorocarbon exterior paint coating construction should meet the following requirements: the concrete or ash wall surface of the new building should be painted with special anti-alkali closed primer for the exterior wall before the painting construction; The construction wall should be flat and clean, without any dirt, and should be fully dried, without the phenomenon of crispy pine and empty drum, the pH value of the construction wall should be lower than 9, the water content should be less than 8%, the new powder cement mortar wall should be maintained for more than 10 days in summer and more than 20 days in winter, Now poured concrete walls in summer need to maintain more than 21 days, winter maintenance needs more than 28 days to build, color paint coating quality and inspection methods should be in line with (GB50210-2001) "building decoration project quality acceptance specifications" in the decoration project 10.3.6 provisions;<br>(5) the split seam arrangement is reasonable, the width and depth of the seam should be uniform, the seam should be smooth, flat, the corners should be neat and smooth.
正在翻译中..