1. Before each production, please confirm the settings of the ICT test software by the engineers of the outsourcing factory. <br>2. Please refer to "N910_Test software instructions.docx" for setting.
1. Before each production, please outsource the factory engineering staff to do a good job of ICT testing software set-up confirmation.<br>2. Specific reference to the N910_Test software instructions .docx set up.
1. Please confirm the setting of ICT test software before each production.<br>2. Refer to N910 for details_ Test software instructions.docx 》Make the settings.<br>