Equipment installation mainly refers to the installation of fans, air conditioning units, air ducts, air valves, and silencers; Installation of main transformers and GIS, high and low voltage complete distribution cabinets, distribution boxes, control boxes, cable and wire laying, installation of lighting switch sockets, and other equipment installation; Installation of water pipes and valves; Laying of contact rail (contact network); Machine room identification, hangers, fire blocking, etc. And complete the single machine debugging, single system debugging, and comprehensive joint debugging of each equipment. The main construction items of station decoration works include: masonry structural engineering and plastering works; Floor, door and window, ceiling engineering; Special parts such as decorative panels (bricks) and finishing works, such as bathroom decoration works and blackening of the top side walls of the track area. In underground construction, due to narrow space, limited space, obstructed vision, humid underground air, poor circulation, as well as various unfavorable factors such as numerous specialties, tight construction period, unsafe material storage during construction, and high distribution density of construction personnel, safety accidents such as personal injury, electric shock, and fire are prone to occur.
正在翻译中..