密度继电器安装:密度继电器安装在横梁中的汇流排上端接口,其电缆应用随设备的卡子固定在横梁上,最后与弹簧机构上插座相连。断路器充SF6气体:断的英语翻译

密度继电器安装:密度继电器安装在横梁中的汇流排上端接口,其电缆应用随设

密度继电器安装:密度继电器安装在横梁中的汇流排上端接口,其电缆应用随设备的卡子固定在横梁上,最后与弹簧机构上插座相连。断路器充SF6气体:断路器本体在出厂时已充入部分SF6气体,现场不须对各单极进行抽真空水份处理,但须将气路连通管中的空气排除,用随机提供的充放气工具将SF6气瓶与充气阀连接,除去气路连通上的包装盖,打开气瓶用SF6气体吹拂5s后立即将气路连通管与各单极上的充气阀连接完毕,并缓缓充至额定压力。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
Density relay installation: <br>The density relay is installed on the upper interface of the busbar in the beam. Its cable should be fixed on the beam with the clip provided with the device, and finally connected to the socket on the spring mechanism. <br>The circuit breaker is filled with SF6 gas: <br>The circuit breaker body has been filled with part of the SF6 gas before leaving the factory. There is no need to vacuum the single poles on site to remove moisture, but the air in the gas path connecting pipe must be eliminated, and the air in the gas path connecting pipe must be removed. Use the deflation tool to connect the SF6 gas cylinder to the charging valve, remove the packaging cover on the gas path, open the cylinder and blow with SF6 gas for 5 seconds, then immediately connect the gas path connecting tube to the charging valve on each single pole, and slowly Charge to rated pressure.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Density relay installation:<br>The density relay is installed at the upper interface of the busbar in the crossbeam, and its cable should be fixed to the crossbeam with a clip attached to the equipment, and finally connected to the socket on the spring mechanism.<br>Circuit breaker filled with SF6 gas:<br>The circuit breaker body has been partially filled with SF6 gas before leaving the factory. There is no need to vacuum and treat the water content of each single pole on site, but the air in the gas circuit connecting pipe must be removed. Use the provided charging and discharging tools to connect the SF6 cylinder to the charging valve, remove the packaging cover on the gas circuit connecting pipe, open the cylinder, and blow with SF6 gas for 5 seconds. Immediately connect the gas circuit connecting pipe to the charging valve on each single pole, and slowly charge to the rated pressure.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Installation of density relay:<br> The density relay is installed in the upper interface of the bus bar in the cross beam, and its cable is fixed on the cross beam with the clip of the equipment, and finally connected with the socket on the spring mechanism.<br> Circuit breaker filled with SF6 gas:<br> Part of SF6 gas has been filled into the circuit breaker body at the factory, so it is not necessary to vacuumize each monopole at the site. However, the air in the gas passage communication pipe must be removed, and the SF6 gas cylinder is connected with the inflation valve with the provided inflation and deflation tool, and the packaging cover on the gas passage communication is removed. After the gas cylinder is opened and blown with SF6 gas for 5s, the gas passage communication pipe is connected with the inflation valve on each monopole immediately, and it is slowly charged to the rated pressure.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: