For these problems can not be repaired, it is recommended that the relevant responsible units carry out project rectification, generate an improvement plan. At the same time, a valid temporary measure or enforceable temporary reception standard shall be issued, and the temporary measure signed by the responsible unit or the provisional reception standard shall be implemented only after the approval of the quality department. Before the problem rectification is in place, the assembly plant needs to strictly implement the temporary measures issued by the signature, and the quality inspection section II shall issue temporary instruction signed in accordance with the temporary reception standard to control the problem.