接到业主的中标通知后,立即进行该项目所需人员、设备、材料的进场准备工作,尽快组织进场和开工准备,抓住工程开工前的时间差。开工前,按照施工总体的英语翻译

接到业主的中标通知后,立即进行该项目所需人员、设备、材料的进场准备工作

接到业主的中标通知后,立即进行该项目所需人员、设备、材料的进场准备工作,尽快组织进场和开工准备,抓住工程开工前的时间差。开工前,按照施工总体计划安排,制订出该项目具体的周、旬、月计划。制订计划时,充分考虑天气及其它不良因素的影响而适当留有余地。施工时,定期检查实际进度是否满足计划要求,一旦实际进度落后于计划进度,则及时会同有关人员分析原因,采取有效措施(如适当加班加点、增加人员及设备投入、改流水作业为平行作业等),经监理工程师批准后实施,以确保关键控制工程进度绝不落后于进度计划安排。加强人员、设备管理,对关键控制工程的设备重点维护、检修,并配备专业修理人员跟班作业,出现故障及时抢修,保证工程设备处于最佳运行状态。由机料部组成专门班子,加强关键工程所用原材料的计划、采购、运输、保管和供应,杜绝停工待料现象的发生。加强地方协调,配备专职人员处理地方关系,协调工程事宜,保证关键工程施工不受影响。加强质量检查,狠抓工程质量,杜绝施工质量事故及隐患,确保关键工程工期。加强现场管理,坚持文明施工、规范施工,营造良好的施工环境。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
After receiving the winning notification owners immediately required for the project personnel, equipment, materials approach the preparation, organization and approach to start preparations as soon as possible, to seize the time before the project starts poor. <br>Before the start, in accordance with the overall construction schedule, develop a specific week of the project, ten-day, monthly plan. Drawing up plans to fully consider the impact of adverse weather and other factors as appropriate leeway. Construction, regularly check the actual progress of the plan meets the requirements, once the actual work fell behind schedule, in conjunction with the timely analysis of the reasons the persons concerned to take effective measures (such as proper overtime, additional personnel and equipment investment, parallel operations, such as assembly-line change ), approved by the supervising engineer after implementation to ensure critical control progress of the project in no way behind schedule arrangements. <br>Strengthen personnel, equipment management, focusing on key control engineering equipment maintenance, overhaul and repair personnel equipped with professional attendant operations, failure timely repair, engineering equipment to ensure optimum operation. <br>The machine feeding part form a special team to strengthen key works with raw materials planning, procurement, transportation, storage and supply, eliminate downtime to be expected phenomenon. <br>Strengthening local coordination, with full-time staff to handle local relations, coordination of engineering matters, to ensure that key project construction will not be affected. <br>Strengthen quality inspection, pay close attention to project quality, construction quality to prevent accidents and hazards, to ensure key construction period. <br>Enhance on-site management, adhere to civilized construction, regulate the construction, create a favorable construction environment.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
接到业主的中标通知后,立即进行该项目所需人员、设备、材料的进场准备工作,尽快组织进场和开工准备,抓住工程开工前的时间差。<br>开工前,按照施工总体计划安排,制订出该项目具体的周、旬、月计划。制订计划时,充分考虑天气及其它不良因素的影响而适当留有余地。施工时,定期检查实际进度是否满足计划要求,一旦实际进度落后于计划进度,则及时会同有关人员分析原因,采取有效措施(如适当加班加点、增加人员及设备投入、改流水作业为平行作业等),经监理工程师批准后实施,以确保关键控制工程进度绝不落后于进度计划安排。<br>加强人员、设备管理,对关键控制工程的设备重点维护、检修,并配备专业修理人员跟班作业,出现故障及时抢修,保证工程设备处于最佳运行状态。<br>由机料部组成专门班子,加强关键工程所用原材料的计划、采购、运输、保管和供应,杜绝停工待料现象的发生。<br>加强地方协调,配备专职人员处理地方关系,协调工程事宜,保证关键工程施工不受影响。<br>加强质量检查,狠抓工程质量,杜绝施工质量事故及隐患,确保关键工程工期。<br>加强现场管理,坚持文明施工、规范施工,营造良好的施工环境。
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
After receiving the bid winning notice from the owner, immediately carry out the mobilization preparation of personnel, equipment and materials required for the project, organize the mobilization and commencement preparation as soon as possible, and grasp the time difference before the commencement of the project.<br>Before commencement, the specific weekly, ten day and monthly plans of the project shall be formulated according to the overall construction plan. When making plans, we should give full consideration to the influence of weather and other adverse factors and leave room appropriately. During construction, regularly check whether the actual progress meets the plan requirements. Once the actual progress falls behind the plan, analyze the reasons with relevant personnel in time, take effective measures (such as appropriate overtime, increase personnel and equipment input, change flow operation to parallel operation, etc.), and implement after the approval of the supervising engineer, so as to ensure that the progress of key control works will never fall behind the plan Schedule.<br>Strengthen the management of personnel and equipment, focus on the maintenance and repair of key control engineering equipment, and provide professional repair personnel to follow the work, timely repair in case of failure, to ensure that the engineering equipment is in the best operation state.<br>The machine and material department shall form a special team to strengthen the planning, procurement, transportation, storage and supply of raw materials used in key projects, and prevent the occurrence of shutdown and waiting for materials.<br>Strengthen local coordination, assign full-time personnel to deal with local relations, coordinate engineering matters, and ensure that key engineering construction is not affected.<br>Strengthen quality inspection, pay close attention to project quality, put an end to construction quality accidents and hidden dangers, and ensure the construction period of key projects.<br>Strengthen on-site management, adhere to civilized construction, standardize construction, and create a good construction environment.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: