After receiving the winning notification owners immediately required for the project personnel, equipment, materials approach the preparation, organization and approach to start preparations as soon as possible, to seize the time before the project starts poor. <br>Before the start, in accordance with the overall construction schedule, develop a specific week of the project, ten-day, monthly plan. Drawing up plans to fully consider the impact of adverse weather and other factors as appropriate leeway. Construction, regularly check the actual progress of the plan meets the requirements, once the actual work fell behind schedule, in conjunction with the timely analysis of the reasons the persons concerned to take effective measures (such as proper overtime, additional personnel and equipment investment, parallel operations, such as assembly-line change ), approved by the supervising engineer after implementation to ensure critical control progress of the project in no way behind schedule arrangements. <br>Strengthen personnel, equipment management, focusing on key control engineering equipment maintenance, overhaul and repair personnel equipped with professional attendant operations, failure timely repair, engineering equipment to ensure optimum operation. <br>The machine feeding part form a special team to strengthen key works with raw materials planning, procurement, transportation, storage and supply, eliminate downtime to be expected phenomenon. <br>Strengthening local coordination, with full-time staff to handle local relations, coordination of engineering matters, to ensure that key project construction will not be affected. <br>Strengthen quality inspection, pay close attention to project quality, construction quality to prevent accidents and hazards, to ensure key construction period. <br>Enhance on-site management, adhere to civilized construction, regulate the construction, create a favorable construction environment.
正在翻译中..