终检留故障车组织分析拉动质量和外检对生产现场的装配工艺和分装工艺进行排查。并反馈视频。终检发现漏气问题100%反馈漏气视频终检发现漏气问题1的英语翻译

终检留故障车组织分析拉动质量和外检对生产现场的装配工艺和分装工艺进行排

终检留故障车组织分析拉动质量和外检对生产现场的装配工艺和分装工艺进行排查。并反馈视频。终检发现漏气问题100%反馈漏气视频终检发现漏气问题100%反馈漏气视频,更换故障件保留分析针对工具箱盖板相关零部件结构,对比奔驰车型结构进行分析。针对问题现状写一页纸进行升级,后转责设计针对问题现状写一页纸进行升级,后转责采购将问题整理成QC报告材料,于第8次改进双周会汇报与总装沟通后将问题整理成QC报告材料,于第8次改进双周会汇报建议采购部组织技术中心、质量、制造召开专题会,对零部件状态进行评审,共同制定改进方案。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
In the final inspection, the faulty car is organized to analyze <br>the quality and external inspection to investigate the assembly process and subassembly process at the production site. And feedback the video. <br>Final inspection finds air leakage problem 100% feedback air leakage video <br>Final inspection finds air leakage problem 100% feedback air leakage video, replacement of faulty parts retention analysis The <br>structure of the relevant parts of the toolbox cover plate is compared with the structure of Mercedes-Benz models. <br>Write one page for the current situation of the problem to upgrade, and then <br>write a page of paper to upgrade the current situation of the problem. After the responsibility is transferred to the procurement, <br>the problem will be sorted into QC report materials, which will be reported <br>after the 8th improvement biweekly meeting and communication with the final assembly Questions were sorted into QC report materials, and reported at the 8th bi-weekly improvement meeting, <br>suggesting that the purchasing department organize technical center, quality, and manufacturing special meetings to review the status of parts and components, and jointly formulate improvement plans.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
Final inspection left fault vehicle tissue analysis<br>Pull quality and external inspection of the production site assembly process and assembly process to check. and feedback the video.<br>The final inspection found a 100% feedback leak video of the leak problem<br>Final inspection found that the leak problem 100% feedback gas leakage video, replacement fault parts retention analysis<br>For the toolbox cover-related component structure, compare the Mercedes-Benz model structure analysis.<br>Write a page for the current situation of the problem to upgrade, and then transfer responsibility for the design<br>Write a page for the current situation of the problem to upgrade, and then transfer responsibility for procurement<br>The issues are organized into QC reporting materials and reported at the 8th Improvement Biennial<br>After communicating with the assembly, the problem is organized into QC reporting materials, which will be reported in the 8th Improvement Biennial<br>It is suggested that the purchasing department organize technical center, quality and manufacturing to hold a special meeting to review the status of parts and components, and jointly formulate improvement plans.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
Organization analysis of failure vehicle in final inspection<br>Pull the quality and external inspection to check the assembly process and sub assembly process on the production site. And feedback video.<br>Air leakage found in final inspection 100% feedback leakage video<br>If the air leakage is found in the final inspection, 100% of the leakage video will be fed back, and the fault parts will be replaced for retention analysis<br>According to the structure of the related parts of the toolbox cover plate, the structure of Benz model is analyzed.<br>According to the current situation of the problem, write a page for upgrading, and then transfer responsibility design<br>According to the current situation of the problem, write a page to upgrade, and then transfer the responsibility to purchase<br>Sort out the problems into QC report materials and report them in the 8th improvement biweekly meeting<br>After communicating with the general assembly, sort out the problems into QC report materials and report them in the 8th improvement biweekly meeting<br>It is suggested that the purchasing department should organize the technical center, quality and manufacturing to hold a special meeting to review the status of parts and components, and jointly formulate improvement plans.
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: