In the workshop craft layout, the overall design should have a overall importance concept. The arrangement of equipment defers to the technical process the order to carry on as far as possible, causes the production process occupying a land area of to be smallest, the production cycle is shortest, the operation is most convenient.In addition, but also should consider the multi-variety production, the production workshop and other workshop technical process also may coordinate mutually.At the same time, also cannot forget the workshop the production health and the labor protection, as well as the natural lighting, ventilates, facilities and so on heating, refrigeration. If has may in the outdoors installment equipment, may build a simple wigwam in the outdoors.