The material in advance to do a good job of sampling, pre-buried positioning, commissioning and then large-scale construction. First of all, the stand-alone commissioning, and then the various divisions of the joint debugging. According to the site construction conditions, arrange the flat façade cross-construction and flow operation plan of each type of work.
正在翻译中..