125吨/小时金铜矿浮选厂生产线流程选矿工艺方案说明1)破碎筛分系统原矿堆存于原矿堆场,采用铲车上矿。原矿仓底设槽式给料机,给矿至一段颚式破的英语翻译

125吨/小时金铜矿浮选厂生产线流程选矿工艺方案说明1)破碎筛分系统原

125吨/小时金铜矿浮选厂生产线流程选矿工艺方案说明1)破碎筛分系统原矿堆存于原矿堆场,采用铲车上矿。原矿仓底设槽式给料机,给矿至一段颚式破碎机进行粗碎,原矿石头入料粒度需要小于480mm,经过一段破碎机后,细度达到50mm左右,粗碎排矿经皮带运输机二段圆锥破碎机进行细破作业,二次破碎后细料经过皮带输送机运至振动筛进行筛分作业,筛下物细度为20mm左右,进入粉矿仓,筛上矿由2号皮带运输机返运至三段圆锥破碎机进行细破作业,三段细度最大入料细度小于150mm,出料细度为20mm左右,破碎后矿石也通过皮带输送机送至振动筛进行筛分。筛下矿皮带输送机运至粉矿仓存储。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
125 tons/hour gold-copper ore flotation plant production line process <br>ore beneficiation process plan description <br>1) Crushing and screening system The <br>raw ore is stored in the raw ore yard, and the ore is loaded with a forklift. A trough feeder is installed at the bottom of the raw ore silo to feed the ore to a jaw crusher for coarse crushing. The raw ore head needs to be less than 480mm in size. After the first crusher, the fineness reaches about 50mm. The coarse crushing is discharged through a belt conveyor. The second-stage cone crusher is used for fine crushing. After the second crushing, the fine material is transported to the vibrating screen through a belt conveyor for screening. The fineness of the under-screen is about 20mm and enters the fine ore bin. The upper ore is screened by the No. 2 belt The conveyor is returned to the three-stage cone crusher for fine crushing. The maximum fineness of the three-stage fineness is less than 150mm, and the discharge fineness is about 20mm. After crushing, the ore is also sent to the vibrating screen through a belt conveyor for screening. The under-sieve ore belt conveyor is transported to the powder ore warehouse for storage.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
125 tons/hour gold and copper flotation plant production line process<br>Description of the mineral process<br>1) Broken screening system<br>The original ore pile is stored in the original ore yard and the mine is mined by forklift. The original mine warehouse bottom slot feeder, to the mine to a jaw-type crusher for rough crushing, raw ore stone into the particle size needs to be less than 480mm, after a section of crusher, fineness reached about 50mm, coarsely crushed ore through the belt transporter two sections of cone crusher for fine-breaking operation, secondary crushing after the fine material through the belt conveyor to the vibration sieve Screening operation, the fineness of the screen is about 20mm, into the powder mine silo, the sieve ore from the No. 2 belt transporter back to the three-segment cone crusher for fine-breaking operation, three sections of fine maximum feed fineness is less than 150mm, the discharge fineness is about 20mm, after breaking ore is also sent through the belt conveyor to the vibration sieve for screening. Sieve the mine belt conveyor and transport it to the powder warehouse storage.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
125吨/小时金铜矿浮选厂生产线流程选矿工艺方案说明1)破碎筛分系统原矿堆存于原矿堆场,采用铲车上矿。原矿仓底设槽式给料机,给矿至一段颚式破碎机进行粗碎,原矿石头入料粒度需要小于480mm,经过一段破碎机后,细度达到50mm左右,粗碎排矿经皮带运输机二段圆锥破碎机进行细破作业,二次破碎后细料经过皮带输送机运至振动筛进行筛分作业,筛下物细度为20mm左右,进入粉矿仓,筛上矿由2号皮带运输机返运至三段圆锥破碎机进行细破作业,三段细度最大入料细度小于150mm,出料细度为20mm左右,破碎后矿石也通过皮带输送机送至振动筛进行筛分。筛下矿皮带输送机运至粉矿仓存储。<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: