Bearing area updating view of two new wells drilled <br>S.9B FIG configuration (2014) is divided into four Block <br>S.9 FIG configuration (2009) is divided into six Block <br>drilled information <br>Basic information <br>block BASIC
Update the oily area map after drilling 2 new wells.<br>The S.9B construction diagram (2014) divides four breaks.<br>The S.9 construction diagram (2009) divides six breaks.<br>Drilling data.<br>Basics.<br>Block basics.