(1)野外勘探现场勘探由100型钻机完成,开孔直径146mm,终孔直径110mm,所有钻孔均采用泥浆护壁取芯钻进,钻孔控制操作的具体方法按《的英语翻译

(1)野外勘探现场勘探由100型钻机完成,开孔直径146mm,终孔直径

(1)野外勘探现场勘探由100型钻机完成,开孔直径146mm,终孔直径110mm,所有钻孔均采用泥浆护壁取芯钻进,钻孔控制操作的具体方法按《岩土工程勘察规范》(GB 50021-2001,2009年版)第9.2.4条及《建筑工程地质勘探与取样技术规程》(JGJ87/T-2012)执行。为避免因勘探造成对工程不利的危害(隐患),在钻探观测和测试工作完成后,均用原土或干的粉质黏土对钻孔位置分层灌实回填。
0/5000
源语言: -
目标语言: -
结果 (英语) 1: [复制]
复制成功!
(1) field exploration <br>field exploration completed by the rig 100, the opening diameter of 146mm, 110mm diameter final hole, using all drilling mud wall core drilling, the drilling specific control operation according to the method "investigation of geotechnical engineering" (GB 50021 - 2001, 2009 edition) and section 9.2.4 "construction engineering geological exploration and sampling technical Specification" (JGJ87 / T-2012) to perform. <br>To avoid causing exploration to project adversely harm (hazards), and observation after test drilling work is completed, all with the original soil or dry powdered clay for the drilling location hierarchy irrigation real backfill.
正在翻译中..
结果 (英语) 2:[复制]
复制成功!
(1) Field Exploration<br>On-site exploration by 100 drilling rigs, opening diameter 146mm, final hole diameter 110mm, all drilling is using mud wall core drilling, drilling control operation of the specific method according to the Geotechnical Survey Specification (GB 50021-2001, 2009 version) Article 9.2.4 and "Construction Geological Exploration and Sampling Technical Procedure" (JG87/T-2012) implementation.<br>In order to avoid the hazards (hidden dangers) that are detrimental to the project due to exploration, the drilling positions are layered and backfilled with original soil or dry powder edusd clay after the drilling observation and testing work is completed.
正在翻译中..
结果 (英语) 3:[复制]
复制成功!
(1) Field exploration<br>Field exploration is completed by 100 drilling rig, with opening diameter of 146mm and final hole diameter of 110mm. All drilling holes are drilled with mud wall protection and coring. The specific method of drilling control operation shall be in accordance with article 9.2.4 of code for investigation of Geotechnical Engineering (GB 50021-2001, 2009 Edition) and technical code for geological exploration and sampling of Construction Engineering (jgj87 / t-2012).<br>In order to avoid adverse hazards (hidden dangers) to the project caused by exploration, the original soil or dry silty clay shall be used to fill and backfill the drilling position in layers after the completion of drilling observation and test.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: