Interim measures: the tube assembly, wiring harness rationalize fixed to avoid confusion into the group. A column mounted state according to the existing state of reception.
Temporary measures: The assembly of the tube, harness straightened fixed, to avoid confusion. The post-installation A-pillar status is received in the existing state.
Temporary measures: arrange and fix the pipes and wire harnesses in order to avoid confusion. After installation, the A-pillar status is received according to the existing status.<br>