Column template using heptation plate, in the column rebar, reserved holes, pre-buried parts and experience, can stand the template, template external equipment 60 × 80 square wood, and then set up temporary support, and then interspersed with 12 Round steel made of pull bolts, correct verticality and flatness, tighten the nut, and finally in the column mold plus pile hoop fixed, column hoop spacing is not greater than 600mm, and finally the use of steel pipe and cross fastener tension. The support bar is connected with the support frame of the floor to improve its integrity.
正在翻译中..