Cold bed pre-buried parts have begun production, the inspection process found that some of the pre-buried parts of welding stress and deformation, the site requires the relevant person in charge of rectification, workers use the grooved steel after grooving straightening, the problem work parts have been straightened. As the drawings have not yet been determined and it is not yet possible to determine whether they are qualified, we will continue to follow up
正在翻译中..