4) When tearing down the frame should observe whether there are nearby power lines and other obstacles, it is strictly forbidden to collision near the power cord, to prevent electric shock accident.<br>5) Materials delivered to the ground shall be transported with the removal of the designated place, classified and stacked, the day of demolition clear, proper custody.
正在翻译中..