The test results show that the drilling cycle is significantly ahead of the planned cycle, and the drilling speed is 1.46 times that of the fastest recorded well in the block. The advantage is particularly obvious in the intermediate completion operation stage.
The test results show that the drilling cycle is much ahead of the planned cycle, and the drilling speed is 1.46 times that of the fastest recorded well in the block, especially in the middle stage of operation.
The test results show that the drilling period is much earlier than the planned period, and the drilling speed is 1.46 times of the fastest logging well in the block, especially in the middle completion stage.<br>