7, simulation operation<br>7.1 Close the power switch, the power LED is on, and the telecommunications window on the meter shows that it is ready for work.<br>7.2 Press the oil pump start button, the oil pump running indicator is on, check the correct direction of operation, there is no abnormal sound. In the event of a reversal, this can be corrected by adjusting the sequence of the oil pump motor wiring.<br>7.3 Check whether the expansion tank level alarm is reliable, when the level is less than 1/3 of the height of the expansion tank, a low level alarm should occur; Otherwise, the settings of the float level controller should be adjusted.<br>7.4 Manual over-temperature alarm meter or temperature switch to verify that it is sensitive and reliable.<br>8, heating operation<br>After the simulation operation confirms - - cut normally, the heating operation can be carried out.<br>8.1 Adjust and set the parameter values of each instrument according to the heating requirements.<br>8.2 Start the oil pump.<br>8.3 Press the heating button, the heating light is on, the system starts to heat up, at this time to observe whether the instrument indication is correct, if there is a reverse indication or indication, should check the thermocouple or thermocouple wire is correct.
正在翻译中..